PDA

View Full Version : The tape measure lied, dang plumbing issues


khaosinc
06/26/2010, 10:12 PM
Supposed to be a nice easy job, had everything measured out so I could plumb the mangrove swamp in today. The dang tape measure lied to me.

http://i6.photobucket.com/albums/y228/Khaosinc/020-3.jpg

http://i6.photobucket.com/albums/y228/Khaosinc/021-3.jpg

I need another 1/4" to tighten up the bulkhead.... thereis a really good reason not to take a sawzall to the side of the house again.... right? not like it would be the first time...

I don't wanna drain it to move it 1/4" besides, I'm almost out of salt.

http://i6.photobucket.com/albums/y228/Khaosinc/022-2.jpg

nmbeg
06/27/2010, 12:58 AM
i have a leaking bulkhead since i built system. the stand doesn't have good access to the underside of the bulkhead (under the overflow). can't tighten it. i put a bowl to collect water there. it'll leak forever. hope you can figure out how not to do that.

khaosinc
06/27/2010, 01:08 AM
ahhh the heck with it. More in my build thread..

http://i6.photobucket.com/albums/y228/Khaosinc/001-4.jpg

nmbeg
06/27/2010, 01:10 AM
nothing like a good laugh at 2 in the morning.

you really live up to your title, "how NOT to build...."