PDA

View Full Version : How did you plumb your reactors?


offroadr
01/25/2012, 08:47 AM
Would like to see your manifolds, etc

Do you have pics or diagrams of how you plumbed them into your system?

Thanks

Dustin1300
01/25/2012, 10:08 AM
I've not got it built yet but I'll just have a 1 1/2 inch pipe pressurized from the return with several Ts and ball valves so you can adjust flow. I'll have several so I have different options in the future should I want to plumb in additional equipment.