I plan on using a 2-Chamber Sump, no fuge, so I plan on adding (2) reactors, (1) Carbon and (1) Phosphate Reactor. I plan on using (1) "T" off the return pump to go into Ball Valve --> PVC Flex Tube --> Reactor1 --> PVC Flex Tube Out --> Ball Valve --> PVC Flex Tube --> Reactor2 --> Dumps into Return Area.

Would it be better to put in a second "T" off the return line, one for each reactor, but then the water being treated wouldn't be running through both reactors at the same time? Or, leave it as first described?