Piping up the jebao dcp-5000
What is the best way to couple the pump to my 3/4" return pipework?
I have hard plumbed down to the pump, then I was going to use flexible PVC clear pipe from pump to pipework (to reduce vibration), but how does all this fit together, what fittings do I need? Does the clear PVC pipe just push into the Jebao coupling? does it need to be glued? https://www.dropbox.com/s/0s89cynkaj...05000.PNG?dl=0 https://www.dropbox.com/s/6ee9yu1b4o...35-24.png?dl=0 |
Those fittings should accept standard size PVC pipe which would need to be glued in.
|
Only pvc pipe goes into the fittings, not clear.
|
You can go flex if desired
If you have your heart set on flexible you could glue a pcv threaded female end and add a threaded connector with a barbed end for attaching clear flexible...
|
No need for flex on a DCP pump.. Vibrations are not an issue..
Hard pipe right down to it.. |
i agree with mcgyvr.
I have a dcp 1000 i think is the model. I installed it this time last year it just runs runs and runs. never been cleaned or turned off. You can not hear it running and its hard plumbed |
same here, got 2 dcp pump hard plumbed to the pump and no vibration at all.
|
All times are GMT -6. The time now is 06:32 PM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
User Alert System provided by
Advanced User Tagging v3.3.0 (Pro) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.