View Single Post
Unread 04/15/2018, 03:56 PM   #358
Wally.B
Registered Member
 
Wally.B's Avatar
 
Join Date: Oct 2014
Location: Toronto GTA,Canada
Posts: 1,763
Basement RENO (Remaining Flooring SECTION Completed) Last Section [ Hallways ]

I left the Hallway till last since I didn't want to damage a High Traffic Area during Cleanup.

The Rectangular Section wasn't terrible, but had TIGHT/Doorway challenges.



But the NARROW Hallway Section, and Final Door was Really TOUGH. (3 hours of work)



Yellow Zone Was difficult (with Double Diagonal, not Perfect 45 Degree Cuts)

The RED ZONE was Killer (like a Jigsaw Puzzle, Really Challenging on last 2 cuts to get under Doorway TRIM)

It came out so straight/Flush, I may not even bother doing trim.

ONWARD to The REEF TANK SETUP.....




These removable stickers are great. VERY REALISTIC LOOKING (Better than in Photo)
$2 on Alixexpress, and many kinds.

https://www.aliexpress.com/item/find...ceBeautifyAB=0



Last edited by Wally.B; 04/15/2018 at 04:12 PM.
Wally.B is offline   Reply With Quote