View Single Post
Unread 04/09/2017, 10:11 PM   #48
benbarfield
Registered Member
 
Join Date: Jan 2017
Location: Colorado
Posts: 127
I have RedGard all over myself...

Finished installing the cement blocks for the tank stand base. All have been liquid nailed together and allowed to set and dry. After the blocks were left to dry, the exhaust fan was installed. It’s amazingly silent while running.





The sound proofing panels we laid out and painted with the RedGard. The hope is to add some waterproofing to them and give them a little more strength when the painting dries on them. Next was building the new stand frame top. It was built out of 2x6”s. I topped it with liquid nail and screwed ¾” plywood on top. I added a second layer to ¾” plywood on top and secured with liquid nail. I am allowing it to dry for 2 days with lots of weight on top to ensure a solid seal between the plywood. Next steps are to cut out the take plumbing holes on the stand and get it down on top of the cement blocks. I am going to paint RedGard all over the wood stand. After that is to build the framing around the tank for the cabinetry.






benbarfield is offline   Reply With Quote