Quote:
Originally Posted by slief
I would have the calcium reactor feed the secondary reactor through the bottom so the effluent exits out the top of the 2nd reactor before heading to the tank.
|
Yep, the shorter of the two on the top is the inlet, and a tube goes to the bottom(it's an upflow design). And then, the vertical outlet ( like the calcium reactor) is short and the opening is at the top. [emoji4]
But everything else look good?
And ahhh.. Teflon paste.. I will have to pick up some in the morning before I put the second chamber into action.. Thanks for that tip!