View Single Post
Unread 01/27/2009, 08:42 PM   #111
BeanAnimal
Registered Member
 
Join Date: Feb 2003
Location: Pittsburgh
Posts: 20,772
1) raise the open channel by 1/2" - 1" to force water into the siphon.

2) ensure that the siphon standpipe is not submerged too far into the sump.

3) you can drill a small hole or two in the siphon standpipe just above the normal operating waterline of the sump.


BeanAnimal is offline   Reply With Quote