I finally finished doing the grout on the bar, now I'm just going through and sealing it... Time consuming as I'm trying not to get sealer on the glass tiles. I drilled the tank (side and bottom) and drilled the counter to accept the pipe that will run through the bottom. I think I have my sump designed, and will start building that once it warms up a little, the acrylic is sitting in the work shed waiting to be cut.
__________________
-February 2007 nTOTM
"The problem with America is stupidity. Why don't we just take the
safety labels off of everything and let the problem solve itself"
Current Tank Info: ADA 60-P
|