View Single Post
Unread 03/13/2009, 05:59 PM   #267
NVReefer
Registered Member
 
Join Date: Mar 2009
Location: Las Vegasish
Posts: 43
bean

thanks for the replies,
yes, run the return through the back in the middle of overflow area, then 90 turn to exit the bottom of overflow into tank

any ideas how to make a Silent drain with my horizontal run. i don't see me using 2.5in piping.


NVReefer is offline   Reply With Quote