Quote:
Originally Posted by ca1ore
There is no way to entirely eliminate the possibility of failure. All you can do is to provide redundancy for the things most likely to fail. Heck, I run three independent switches for my ATO, yet I still had a problem once with the entire volume being dumped into the tank. Reason was almost unbelievable.
|
I'm curious. What was the reason?