Quote:
Originally Posted by Vinny Kreyling
I would still use 1.5 in case the focus changes later on.
|
What is the best between my drawing of the C2C internal overflow / Drill hole in the back with BA or the original BA drawing?
Does the full syphon need to be lower like my drawing or is it not necessary ?
How many inch need the space between the top of the overflow and the emergency ? 1.5'' is it enought without flooding the floor ?
Thanks,