I installed the four MP-60's in the dry boxes. Then, I spent a good amount of time organizing electronics. The cord management isn't complete. I'm still debating controllers and how much I'll actually run through a

controller. For now, everything that is running is plugged in directly to surge protectors. I'm labeling every single outlet and cord so that I have a good reference as to what exactly is plugged into what circuit. I'll

probably write up some documentation for further reference. That will also allow me to start tracking dates for warrenty, service, and bulb replacement.

I built an 8' tall rack that is a "corner" cabinet. It sits in the little corner where the refugium meets the frag rack. That will basically function as an IT rack. I'll have some UPS in there, the controller, and all of

the switches, meters, displays, general electronics interface. I am installing doors tomorrow. The door panels are basically modular removeable panels that I can modify and replace as I start mounting the controller and

switches. The doors themselves will only be opened when I need to modify something in the electronics. Otherwise, it is a sealed box to protect from splashing. I will probably need to vent it. That's the nice thing about

having a modular face to the doors. I can add and remove things as needed without rebuilding the entire cabinet.