View Single Post
Unread 07/21/2017, 07:50 PM   #98
benbarfield
Registered Member
 
Join Date: Jan 2017
Location: Colorado
Posts: 127
I finished up tonight with cutting two holes through the top of the stand. These holes will be future plumbing holes for the refugium tank that will be next to the display tank hidden behind a cabinet door on the far left. This plumbing will drain into the sump below. The second picture shows the trim wood after I put wood filler in to cover where the nail gun shot nails to secure the trim. The last picture is after I finished gluing and securing all the finish trim around the display tank. I had to plane down one of the pieces of wood to make it fit closer. I am going to get everything stay clamped for 48 hours to ensure everything is secure and dry. After that, I will have a lot of sanding to do Sunday on the whole front and sides of the tank. After I finish sanding, it’s time to stain everything. Stay tuned…

IMG_1956

IMG_1957

IMG_1954


benbarfield is offline   Reply With Quote