View Single Post
Unread 08/15/2015, 09:36 PM   #19
ijnoj09
Registered Member
 
ijnoj09's Avatar
 
Join Date: Jul 2015
Location: Chino, CA
Posts: 68
Got a chance to work on the plumbing today. This was my first time working with PVC and it wasn't as hard as I thought it would be. Just need to take your time and measure everything and test fit. I had a slight miscalculation on the T section to the ball valves. I didn't leave enough room to install straight barb reducer fittings as it ends up being too close to the the main drain piping. I'm debating whether to redo that section but I might just end up using 90 elbow barb fittings. Other then that minor error, I'm pretty satisfied with how everything turned out, just letting it cure and tomorrow I can hook everything up and fill the tank!




ijnoj09 is offline   Reply With Quote