|
06/25/2018, 08:09 AM | #1 |
Registered Member
Join Date: Apr 2015
Location: DeLand, FL
Posts: 28
|
Plumbing design help
I am finally at a point where I can get started working on my 180g again and I was hoping to get some input or critique on the plumbing I was intending on doing.
The tank is a 180g RR with dual overflows. I was going to do a herbie setup on them with two drains w/ gate valves for adjustments and 2 emergency drains dumping into the large middle refuge in the sump. I am planning on doing a single line return up the back of the tank and a 2nd return in the future with a manifold so that I don't mess with the pressure on the main return and the herbie system. Any issues with this setup that I may run into? |
|
|