![]() |
Stand finished - moving on to plumbing
I finally finished my stand. I've got a 65g reef ready tank, its got holes for a 3/4" and 1" bulkhead. I want to run full siphon on 1, and use the other as a backup. From a overflow standpoint, I feel like it is safer to use the 1" as the emergency, but I'm worried the 3/4 won't produce enough flow
|
If forced at gunpoint to use a herbie system like that ;)
I'd run the 1" as the primary and 3/4" as the emergency.. |
1 Attachment(s)
Thanks - that's what I think I'll do. I bought it used, looks like it came from the factory like this, since the bottom is tempered and there are holes in it :) I'm happy with the way the stand turned out!
|
Can you not drill the 3/4 and make it 1in ? Then your good to go with Herbie system. Return over the back.
|
Nah the bottom is tempered. Its one that was built in the factory with an overflow, tempered the glass after drilling.
|
All times are GMT -6. The time now is 08:42 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
User Alert System provided by
Advanced User Tagging v3.3.0 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.